4.4 Compact Green Roof

  • 4.4.1 Compact Green Roof on reinforced concrete deck

    FOAMGLAS® slabs with hot bitumen

    4.4.1 Compact Green Roof on reinforced concrete deck
    1. Concrete substrate
    2. Primer coat
    3. FOAMGLAS® slabs of
    4. FOAMGLAS® TAPERED slabs, laid in hot bitumen
    5. Two layers of (bituminous) waterproofing membranes
    6. Separating / protective layer
    7. Planting (extensive or intensive)

    Advantages of the FOAMGLAS® system

    • Quality: System with high quality materials. Quality management by systematic site inspections and professional consulting.
    • Cost efficiency: The high durability preserves maximum value and guarantees minimal maintenance costs.
    • Sustainability: Optimum insulation and protection against moisture for generations.
    • Safety: Compact, fully bonded insulation system preventing large-scale damages and renovations in the event of a leak caused by a puncture of the roofing membrane.
    • Functionality: Insulation and vapour barrier in one single functional layer. Flexible and easy installation of a gradient through prefabricated tapered slabs.
    Technical data sheet FG_TDS_4-4-1-UK_1013.pdf
    CAD Drawing FG_CAD_4-4-1-EN00_20121231.pdfFG_CAD_4-4-1-EN00_20121231.dwg
  • 4.4.2 Compact Green Roof on reinforced concrete deck

    FOAMGLAS® READY BLOCK with cold adhesive PC® 500

    4.4.2 Compact Green Roof on reinforced concrete deck
    1. Concrete substrate
    2. Primer coat
    3. FOAMGLAS® READY BLOCK of
    4. FOAMGLAS® READY BLOCK TAPERED, bonded with PC® 500
    5. Two layers of (bituminous) waterproofing membranes
    6. Separating / protective layer
    7. Planting (extensive or intensive)

    Advantages of the FOAMGLAS® system

    • Quality: System with high quality materials. Quality management by systematic site inspections and professional consulting.
    • Cost efficiency: The high durability preserves maximum value and guarantees minimal maintenance costs.
    • Sustainability: Optimum insulation and protection against moisture for generations.
    • Safety: Compact, fully bonded insulation system preventing large-scale damages and renovations in the event of a leak caused by a puncture of the roofing membrane.
    • Functionality: A bituminous waterproofing membrance can be directly torched on to it. Insulation and vapour barrier in one single functional layer. Flexible and easy installation of a gradient through prefabricated tapered slabs.
    Technical data sheet FG_TDS_4-4-2-UK_1013.pdf
    CAD Drawing FG_CAD_4-4-2-EN00_20121231.pdfFG_CAD_4-4-2-EN00_20121231.dwg
    National BIM Library http://www.nationalbimlibrary.com/foamglas/4-4-2-roof-flat-or-tapered-insulation-with-membranes-and-green-planting
  • 4.4.3 Compact Green Roof on trapezoidal metal deck

    FOAMGLAS® slabs with hot bitumen

    4.4.3 Compact Green Roof on trapezoidal metal deck
    1. Metal deck
    2. FOAMGLAS® slabs of
    3. FOAMGLAS® TAPERED slabs, bonded with hot bitumen
    4. Two layers of (bituminous) waterproofing membranes
    5. Separating / protective layer
    6. Planting (extensive or intensive)

    Advantages of the FOAMGLAS® system

    • Quality: System with high quality materials. Quality management by systematic site inspections and professional consulting.
    • Cost efficiency: The high durability preserves maximum value and guarantees minimal maintenance costs.
    • Sustainability: Optimum insulation and protection against moisture for generations.
    • Safety: Compact, fully bonded insulation system preventing large-scale damages and renovations in the event of a leak caused by a puncture of the roofing membrane.
    • Functionality: Insulation and vapour barrier in one single functional layer. Flexible and easy installation of a gradient through prefabricated tapered slabs.
    Technical data sheet FG_TDS_4-4-3-UK_1013.pdf
    CAD Drawing FG_CAD_4-4-3-EN00_20121231.pdfFG_CAD_4-4-3-EN00_20121231.dwg
  • 4.4.4 Green Ready Roof on trapezoidal metal deck

    FOAMGLAS® READY BOARD with cold adhesive PC® 11

    4.4.4 Green Ready Roof on trapezoidal metal deck
    1. Metal deck
    2. FOAMGLAS® READY BOARD, bonded with PC® 11
    3. Two layers of (bituminous) waterproofing membranes
    4. Separating / protective layer
    5. Planting (extensive or intensive)

    Advantages of the FOAMGLAS® system

    • Quality: System with high quality materials. Quality management by systematic site inspections and professional consulting.
    • Cost efficiency: The high durability preserves maximum value and guarantees minimal maintenance costs.
    • Sustainability: Optimum insulation and protection against moisture for generations.
    • Safety: Compact, fully bonded insulation system preventing large-scale damages and renovations in the event of a leak caused by a puncture of the roofing membrane.
    • Functionality: Easy and efficient application of the insulation. A bituminous waterproofing membrane can be directly torched on to it.
    Technical data sheet FG_TDS_4-4-4-UK_1013.pdf
    CAD Drawing FG_CAD_4-4-4-EN00_20121231.pdfFG_CAD_4-4-4-EN00_20121231.dwg
  • 4.4.5 Compact Green Roof on timber substrate

    FOAMGLAS® slabs with hot bitumen

    4.4.5 Compact Green Roof on timber substrate
    1. Timber substrate
    2. Seperating layer / self-adhesive layer
    3. FOAMGLAS® slabs of
    4. FOAMGLAS® TAPERED slabs, laid in hot bitumen
    5. Two layers of (bituminous) waterproofing membranes
    6. Separating / protective layer
    7. Planting (extensive or intensive)

    Advantages of the FOAMGLAS® system

    • Quality: System with high quality materials. Quality management by systematic site inspections and professional consulting.
    • Cost efficiency: The high durability preserves maximum value and guarantees minimal maintenance costs.
    • Sustainability: Optimum insulation and protection against moisture for generations.
    • Safety: Compact, fully bonded insulation system preventing large-scale damages and renovations in the event of a leak caused by a puncture of the roofing membrane.
    • Functionality: Insulation and vapour barrier in one single functional layer. Flexible and easy installation of a gradient through prefabricated tapered slabs.
    Technical data sheet FG_TDS_4-4-5-UK_1013.pdf
    CAD Drawing FG_CAD_4-4-5-EN00_20121231.pdfFG_CAD_4-4-5-EN00_20121231.dwg
 
 
 

Events

References

Snitterton Hall, Matlock – South Darley

Location: Derbyshire, UK
2012

Centre Patronal – Employer’s Federation

Location: Paudex, CH
2000

The Home of FIFA

Location: Zurich, CH
2006